Outrage in the Basque Country: Massive Protests Against Clearing a Historic Forest to Expand a Cemetery
More than 500 people demonstrated in Anglet, Basque Country, against the clearing of parts of the historic Pignada forest for the expansion of the Blancpignon cemetery.
- Around 500 people gathered to protest the development and expansion project of the Blancpignon cemetery in Anglet's Pignada forest.
- Ongoing legal challenges before the Pau Administrative Court seek to halt works converting 1.7 hectares of the forest into buildable land.
- The Mayor of Anglet defends the project, highlighting that the city's cemeteries are reaching full saturation and will run out of burial capacity within two and a half to three years.
On the morning of Sunday, November 15, the town of Anglet in the Basque Country witnessed more than 500 people taking part in an angry demonstration protesting the development and expansion project of the "Blancpignon" cemetery. The project requires clearing and bulldozing part of the "Pignada" forest, which had already suffered a massive fire in 2020, amid widespread indignation from residents who rallied behind the slogan: "We do not kill living beings to bury the dead."
Tree Felling Sparks Public Anger
Clearing operations began on the morning of Thursday, November 12, resulting in the clearing of 7,000 square meters and the uprooting of 80 trees, which triggered a state of shock among locals. Catherine, a local resident, described the scene saying: "For 48 hours, we listened to the sound of falling trees; it was awful." Meanwhile, another resident named Élodie emphasized her attachment to the site, stating: "This is the forest of my childhood, and I want to protect it. I have never seen a sadder sight than the start of the felling."
For her part, Mahaut Fanchini, an opposition member of the Anglet municipal council, expressed regret over the damage inflicted on the Pignada forest massif, which serves as a symbol of the town, noting that alternative solutions on different land could have been explored to prevent the destruction of the forest.
Legal Battle and Biodiversity Concerns
On the legal front, Dorothée Mandile, an environmental law attorney registered with the Bayonne Bar, explained that the zoning reclassification of the area has not yet been definitively validated in court. The Administrative Court of Pau is still reviewing multiple appeals seeking to annul the amendment to the Local Urban Plan (PLU), which designated 1.7 hectares of the forest as buildable land.
Environmental associations had filed an urgent summary application (référé) on November 10 to halt the commencement of the works, but the Administrative Court of Pau rejected it. Consequently, opponents filed a new complaint on Friday, November 13, demanding the immediate suspension of the clearing operations, warning against the pouring of concrete and the destruction of biodiversity. Furthermore, an environmental study indicated the presence of the protected "black woodpecker" (pic noir) at the work site, a circumstance that may require a special exemption permit which the municipality has not applied for.
Municipality Emphasizes Burial Capacity Crisis
In response, the Mayor of Anglet, Claude Olive, defended the project, asserting that the municipality had obtained all necessary permits and stressing that he is awaiting the court's ruling. Olive explained that the matter stems from an urgent necessity that brooks no delay, as two of the city's three cemeteries are already completely saturated.
The mayor warned that the current Blancpignon cemetery only has enough remaining capacity to accommodate burials for two and a half to a maximum of three years, explaining that the cemetery's expansion plan will be carried out in several phases, ultimately encompassing the removal of 1.7 hectares of forested land if the project is fully completed.
Source: France 3





Comments (0)
You must log in to comment on articles.
Log in Sign upBe the first to comment on this article.