Criticism Over Deterioration of High School Near Rouen, Normandy Region Allocates €8 Million for Renovation
Following student outcry and a national survey highlighting deteriorating conditions at André-Maurois High School in Elbeuf near Rouen, the Normandy region has rejected claims of unfitness and committed €8 million to an extensive renovation plan.
- A ministerial report and survey criticize the deterioration of facilities at André-Maurois High School in Elbeuf, near Rouen.
- Widespread dissatisfaction among students over outdated paint and classroom furniture compared to other schools.
- The Normandy region rejects allegations of neglect and announces an €8 million renovation plan spanning 2024 to 2028.
The physical conditions of André-Maurois High School in the town of Elbeuf, in Seine-Maritime (near Rouen), have sparked widespread controversy after being included in a survey conducted by the French Ministry of National Education in October 2026 on study conditions and the quality of educational facilities, where testimonies from numerous students converged on their struggles with the institution's aging and dilapidated facilities.
Student Dissatisfaction with Outdated Equipment
Outside the high school gates, students voiced their frustration over the general condition of the buildings, pointing out that desks and chairs in some classrooms appear older than they are, alongside peeling paint and deteriorating walls that reflect a lack of modernization for long periods. Some newly enrolled students coming from middle schools also expressed shock at the stark contrast between their recently renovated, modern middle schools and the reality of this aging high school, with the exception of the garden and green spaces, which received praise among them.
Normandy Region Responds, Denying Unfitness Claims
In response, the Normandy region, responsible for the maintenance and management of high schools in the territory, challenged the survey's findings, arguing that the methodology used lacked rigorous standards and ignored the reality on the ground and daily operations within the educational institution. Regional authorities affirmed that the high school is by no means an unfit place for study, highlighting the allocation of a substantial budget of eight million euros for renovation between 2024 and 2028.
A Work Plan Extending Until 2028
Regional authorities explained that around one million euros of the total budget has already been invested, covering the refurbishment of about thirty classrooms, the modernization of school catering scullery facilities, alongside the creation of sports equipment and an outdoor amphitheater in previously neglected spaces. Work is currently continuing to include asbestos removal (completed in the summer of 2026 in hallways and sanitary facilities), as well as accessibility improvements, upgrading fire safety and protection networks, constructing a new reception desk, and treating the building facades and wiring until the final delivery in 2028.
Source: Actu





Comments (0)
You must log in to comment on articles.
Log in Sign upBe the first to comment on this article.