27 November 2026
Breaking
Available in: 🇩🇿 العربية 🇬🇧 English 🇫🇷 Français ⚙ Machine translation
French News

Severe Heating Crisis in Poissy: Families Face a Harsh Winter and Skyrocketing Electricity Bills

Residents of a residential complex on Rue de Villiers in Poissy are facing a prolonged heating outage lasting over a year, leaving families battling freezing cold, dampness, and soaring energy bills.

Severe Heating Crisis in Poissy: Families Face a Harsh Winter and Skyrocketing Electricity Bills
⚡ In brief
  • Depriving residents of buildings 92, 98, and 102 on Rue de Villiers in Poissy of heating threatens to repeat last winter's harsh conditions.
  • Monthly electricity costs for some residents have surged from €90 to €300 due to relying on temporary space heaters.
  • Authorities expect complex maintenance work to continue until late January 2027, amid widespread frustration and intervention by the municipality.

Residents of a housing complex on Rue de Villiers in the town of Poissy (Yvelines) are enduring a severe and ongoing crisis following a heating outage that has lasted for over a year, amid serious fears of spending another harsh winter without radical solutions. With the return of cold spells in the autumn of 2026, occupants of buildings 92, 98, and 102 have found themselves confronting extreme cold and high humidity inside their apartments, in a situation they described as tragic and nerve-wracking.

Human Suffering and Burdening Bills for Families

Linda, a mother of three, recounts her daily ordeal with sorrow: “My children are constantly sick, and I never stop visiting the doctor. I am currently looking for a job, but I am unable to apply because I am occupied with caring for my children; the situation is catastrophic.” Describing the harsh living conditions, she adds: “My children are freezing. We eat our dinner at 5:30 PM under the blankets, and my infant’s hands and feet are completely frozen. The walls are also covered with mold and dampness to the point that steam comes out of our breath inside the house.”

For her part, Sarah, a resident of building 102, confirmed that she has been living without heating since February 13, 2026. This crisis directly impacts living costs; one neighbor reported that resorting to small electric space heaters shockingly drove their monthly electricity bill from €90 up to €300, even though these devices remain insufficient to properly heat the homes.

Commercial Compensation and Highly Complex Network Failures

In response, the social housing landlord, “Batigère Habitat,” confirmed that it has distributed auxiliary electric heaters and provided commercial discounts to alleviate the burden of the bills, tailored to the nature of each residence and the occupants' situation. The landlord noted that a reduction was applied in November and another in December, and that this measure will continue as long as necessary.

The organization explained that the outage stems from deterioration and multiple breakdowns within the central heating network that require extensive repairs. The technical difficulty lies in the fact that sections of the piping are located inside narrow crawl spaces not exceeding 70 centimeters in height, making access exceedingly difficult and requiring prolonged preparatory work before repairs can commence.

Delayed Timeline and Action from the Municipality

Although a repair order was signed with the company “Sofratherm” on November 17, 2026, procuring the necessary materials requires approximately three weeks, followed by projected works extending for three weeks per building. This means that technical issues are not expected to be resolved before late January 2027.

Faced with this reality, the Mayor of Poissy, Sandrine Berno Dos Santos, described the situation as “unacceptable,” expressing deep concern over the management of the homeowners association (ASL) by the firm “Quadral” due to a lack of financial transparency and the failure to hold any general assembly for over two years. The mayor sent an official letter on October 16, 2026, demanding that the company shoulder its responsibilities and supply adequate equipment, stressing ongoing coordination with “Batigère Habitat” to expedite the restoration of buildings 98 and 102 to protect residents from the fallout of this administrative negligence.

Source: Actu

What do you think of this news?

Related articles

Comments (0)

Be the first to comment on this article.